Items Needed
- 1x Flatgekko™ C23 Axle Steering Link (Due to your pick)
- 1x Flatgekko™ C23 Steering Link (Due to your pick)
- 1x Flatgekko™ C23 Panhard Link (Due to your pick)
- 2x Flatgekko™ C23 Front Upper Links (Due to your pick)
- 2x Flatgekko™ C23 High-Clearance Front Lower Links (Due to your pick)
- 2x Flatgekko™ C23 Rear Upper Links (Due to your pick)
- 2x Flatgekko™ C23 High-Clearance Rear Lower Links (Due to your pick)
- 20x Rod Ends
- 8x Flatgekko™ GreenTEC Pro Carbon C23 High-Clearance Link Socks (C17090060)
Colors
● – Axle Steering Link
● – Steering Link
● – Panhard Link
● – Front Upper Links
● – Front Lower Links
● – Rear Upper Links
● – Rear Lower Links
Bend Positioning
- Panhard Link: bend must be closer to the Panhard Mount mounted on the left chassis rail for AR44/AR45P axles but closer to the panhard link axle side mounting point for Enduro axles (additional bending or adjustments may needed due to your build)
- Front Upper Links: bend must be closer to the tranny
- Rear Upper Links: bend must be closer to the tranny
- Rear Lower Links: bend must be closer to the rear axle
Tools Needed
- 1x 2mm Hex Screw Driver
Assembly Process
- Pull/drive the black link socks (8pcs) on both ends of lower suspension links. These are to avoid hanging up at the rod ends. As link socks need to give a tight fit we recommend to install them by winding in front of a nut before mounting the rod ends. No winding by hands nor by the rod end are recommended.
- Mount rod ends fully covering the 10mm threads.
- Mount links to their location.